Wastewater CIP Inflow and Infiltration Project MS-7 for the City of Waynesboro

This project consists of the rehabilitation of approximately 380 linear feet (L.F.) of 6-inch, 3,400 L.F. of 8-inch and 85 L.F. of 12-inch sewer line with cured-in-place pipe liner; approximately 20 L.F. of 6-inch and 160 L.F. of 8-inch sewer line point repairs; the rehabilitation of 31 manholes; the replacement of 31 manhole cones and frames and covers, the rehabilitation of 2,490 L.F. of sewer laterals, and the replacement of 83 cleanout caps, reinstatement of 83 service connections and all associated appurtenances.