Eason Hall Chiller Replacement, Project Code 214-18695-003 at Longwood University
The project is generally described as the Removal and replacement of the existing water-cooled chiller; Removal and replacement of the primary and secondary pumps and installation of new backup pumps; Replacement of chilled water piping near the chiller; Replacement of the existing refrigerant monitor to detect the new refrigerant type. Provide power for the new chiller, pumps and any other necessary equipment.
Specifications
(click to expand/collapse)
Name | Size | ||
214-18695-003 LU Eason Hall Chiller Replacement Project Manual | 7.4 MB |